The work zone will be from the U.S. 30 interchange (exit 44) in Rock Falls to just west of the U.S. 30 spur interchange (exit 36).
Work in 2025 patched I-88 and repaired its bridges crossing Elkhorn Creek and Polo Road. Also, the crossing over the abandoned BNSF railroad was removed. Work this year will mill and resurface the highway. One lane of traffic in each direction will be maintained during the $26.8 project, which is expected to be completed in November.
Motorists can expect delays and should allow extra time for trips through this area and be prepared for slow and stopped traffic. To avoid the work area, when feasible, the use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices, and be alert for workers and equipment.